Form E.R.-7
Annual Installed Capacity Statement
1. Name of the manufacturer:
2. Address of factory
3 Central excise registration number:
4. (i) Annual declaration
(ii) Amendments to declaration already filed
(Pl. tick the appropriate box)
5. Installed capacity as on ----------------------
6. Details of installed capacity of the factory
Sl No Description of each
class of goods
manufactured
Unit of measure Annual production
capacity
7. Details of main plant and machineries installed
Sl. No. Description of
main machineries
/plant
Technical specifications
(make, model, etc.)
Year of installation
8. Details of electricity connection:
(a) Name of electricity supplying company
(b) Total number of electricity meters installed in the factory
(c) (i) Electricity consumer number:
(ii) Electricity meter number(s):
(d) Sanctioned electricity load:
(i) Unit of measurement (HP/KWh/others-specify)
(ii) Quantity
(e) (i) Whether captive power plant installed
(ii) If so, its installed capacity
9. (i) I/We_____________________________ hereby declare that the
information given above is true, correct and complete in every respect to
the best of my/our knowledge and belief.
(ii) I/We am/are authorized to sign this declaration.
(Name in capital letters and signature
of the assessee or authorized signature)
Place:
Date:
ACKNOWLEDGEMENT
D D M M Y Y Y Y
Date of
receipt
Place:
Date:
Name and signature of the officer with seal
INSTRUCTIONS
1. In serial number 6, ‘Each Class of Goods’ means a broad category of goods which are cleared/sold from factory. For example, for a pharmaceutical unit, all types of tablets, capsules and syrup will be regarded as different classes of
goods
2. In serial number 7, ‘Main machineries/plant’ means the machineries/plant producing the final product or intermediate product. For example, for a factory producing steel bar from iron ore, the kiln (used for making sponge iron), furnace (used for making ingot) and rolling mill (used for making steel bar) would be regarded as the main machinery/plant.
3. Where the excise duty is levied at specific rate, the same quantity measurement code as applicable for payment of duty shall be used for providing installed capacity.
4. Wherever quantity codes appear, indicate relevant abbreviations as given below. Quantities Abbreviations Quantities Abbreviations
Centimetre(s) cm Metre(s) m
Cubic
centimetre(s)
cm3 Square metre(s) M2
Cubic metre(s) m3 Millimetre(s) mm
Gram(s) g Metric tonne mt
Kilogram kg Number of pairs pa
Kilolitre kl Quintal q
Litre(s) l Tonne(s) t
Thousand in number Tu Number u
5. In case, any substantial expansion/addition of machineries is carried out during the year resulting into increase in the installed capacity by more than 25% of one class of product, an amendment to the declaration should be filed within 30 days of commencement of production of these new machineries.”